HAZEL FOXLEY
GENERATING STATIONMAIN CONTROL BOARDUNIT 1
STATION TIME
GRID HZ
HRS SINCE LAST TRIP
GROSS MWH
TEST
SILENCE
ACK
RESET
KEYS: T TEST · S SILENCE · A ACK · R RESET
DRUM LEVEL %
FEED FLOW GPM
MAIN STEAM °F
FIRING RATE %
SYNC
LIGHTS
DRUM PRESS 0–1000 PSIG
DRUM LEVEL 0–100 %
GEN OUTPUT 0–80 MW
CHART SPEED 2 IN/MINRECORD
RUN
STOP
OVLD
RUN
STOP
OVLD
FLAME
OFF
PURGE
START
STOP
PIC-201
PV
SP
MANAUTO
DRUM PRESSURE
LATCHED
TRIPPED
LATCH
TRIP
SPEEDLOAD
LOWER
RAISE
CLOSED
OPEN
SYNC OK
NOT 11. NOT 1.
AUDIBLE
SEQUENCE OF EVENTS RECORDER
ON LINEPAPER
UNIT 1 — QUICK REFERENCE
- ALARM: SILENCE, then ACK. RESET only after it clears.
- BURNER: START. 4 s purge, then light-off.
- TURBINE: LATCH at 250 psig or more. Rolls to set speed.
- SYNC: RAISE/LOWER until the scope turns slowly toward FAST.
- 52G: turn to CLOSE as the needle passes 12 o'clock.
- LOAD: RAISE. Watch drum pressure.
RED = RUNNING / CLOSED · GREEN = STOPPED / OPEN
REV. C — 04/97
MAIN CONTROL BOARD
MODEL MCB-1 SER. 0417-96
120 VAC 60 HZ 1Ø 15 A
INSPECTED 03-14-96